What’s planned at Mulberry Park Educate Together Primary Academy, Mulberry Way
- Reference
- 26/02697/SOLPA
- Address
- Mulberry Park Educate Together Primary Academy, Mulberry Way, Combe Down, Bath, BA2 5BU
- Ward
- Combe Down
- Area
- Combe Down
- Type
- Solar Photovoltaics Prior Approval
- Status
- Approved
- Decision
- Approve
- Received
- Validated
- On the register
- Comments close
- (closed)
- Decided
- Council page
- 26/02697/SOLPA on the B&NES register

In short
What it is
Addition of 30sqm of PV panels to existing school roof
The application says: “Addition of 30sqm of PV panels to existing school roof”
Read the plans and the decision on the council’s planning page.
Inside
Zones the site sits in
Where
Where it is
The larger pin in the middle is this one. The smaller pins around it are the things listed below, all within a ten-minute walk.
51.36197, -2.35420 · Open in a map
Nearby
Near this
-
Outside changes to a listed building: replacement of three front sash windows. Replacement of rear casement windows and rear door…
3 Byfield Place, Combe Down, Bath, BA2 5JB
-
Follow-up details for an approved plan: build rear/side extensions following demolition of the existing garage and external insulation…
Ashleigh, Perrymead, Lyncombe, Bath, BA2 5AX
-
Tree work: 3 Field maple: reduce crown height by 3m. Beech: reduce crown height by 2.5m. Italianate Cypress: fell
Honeysuckle Farm, Perrymead, Lyncombe, Bath, BA2 5AU
-
Listed building: install 4 replacement timber sliding sash windows located on the rear elevation
101 Church Road, Combe Down, Bath, BA2 5JJ
-
Tree work: Eucalyptus T1: fell
6 Williamstowe, Combe Down, Bath, BA2 5EJ
-
Tree work: T1 Beech: remove 4 (pictured) limbs to enable ladder access to the comms pole within
High Meadow, Perrymead, Lyncombe, Bath, BA2 5BA