What’s planned at 9 Chapel Close, Chew Stoke
- Reference
- 26/03680/FUL
- Address
- 9 Chapel Close, Chew Stoke, Bristol, BS40 8XX
- Ward
- Chew Valley
- Parish
- Chew Stoke
- Area
- Chew Valley
- Type
- Full Application
- Status
- Under consideration
- Received
- Validated
- On the register
- Comments close
- Target decision
- Applicant
- Mr and Mrs Fowler
- Agent
- Bristol Design And Architecture Ltd
- Conservation area
- No
- Listed building
- No
- Council page
- 26/03680/FUL on the B&NES register

What it is
Build single-storey side extension, an open-sided carport and roof-mounted solar PV panels together with rendered external walls
The application says: “Construction of a single-storey side extension, an open-sided carport and roof-mounted solar PV panels together with rendered external walls”
Comments close on . Read the plans and comment on the council’s planning page.
Where it is
The larger pin in the middle is this one. The smaller pins around it are the things listed below, all within a ten-minute walk.
51.35234, -2.63311 · Open in a map
Near this
-
Tree work: T 11: silver Birch, minor crown lift to height of 3.0ms T 12: Silver Birch…
4 The Cedars, Chew Stoke, Bristol, BS40 8TR
-
Tree work: Silver Birch: remove
Church Gate House, Church Lane, Chew Stoke, Bristol, BS40 8TU
-
Junction of Blind Lane and Bristol Road
These closure signs have been forgotten and left out.
-
Blocked drain opposite pear tree cottage on opposite side of road
The drain is full off earth earth and mud so is blocking when there is rainful causing excess surface water on the road
-
One 20mph Terminal sign is obscured by foliage & the other nearly obscured.
On School Lane, Chew Stoke, one 20mph Terminal sign is obscured by foliage & the other nearly obscured.
-
Lovely crossing camber resurfaced with rubbish material
Pretty new courtsey crossing was repatched with material that just looks rubbish, real shame.