Your Sunday email

Street problems · Peasedown · FixMyStreet (B&NES) · updated

Street problems in Peasedown

2 problems reported in Peasedown in the last week, and 21 still open on the council’s list. The most common this month: street light fault (5).

Reported this week
2
Problems reported in Peasedown in the last seven days
FixMyStreet (B&NES) ·
Still open
21
On the council’s list, not yet marked fixed
FixMyStreet (B&NES) ·
Most common this month
Street Light Fault
5 reports
FixMyStreet (B&NES) ·
Showing 61–77 of 77 · newest first
Lights out on roundaboutThe lights on the roundabout are not working · Street Light Fault · OpenBoth drains at end of road blockedThe drains outside number 11 are blocked causing concern by residents as its on a hill so any flood water would get into homes · Blocked drain · ClosedBlack bags dumped on green space junction of Wellow lane and Wellow meadDumped sometime Friday night · Fly-tipping · ClosedOvergrown weeds and litter on the bath Road between Tesco & The schoolExcessive or dangerous littering · OpenWeeds on pavement and also growing by storm drainThese weeds have not been touched for over 18 months and need to be removed to stop pavement damage and to ensure drains remain clear · Removal of Weeds · OpenOver hanging vegetationOver hanging vegetation from a private garden. · Overhanging Vegetation · ClosedLight (C5) not working,Street light has not been working for over a year. · Street Light Fault · ClosedOvergrown Hedges in Wansdyke Workshops growing into 5 Wellow TyningThe hedges in Wansdyke Workshops (BaNES property) along the fence of 5 Wellow Tyning BA2 8LJ are growing into the garden of number 5. · Obstructive vegetation · OpenFootpath overgrown at Carlingcott Mill - from roadway (end of Wick lane) to the bridge over the Cam Brook.Not urgent but the footpath from the roadway (end of Wick Lane) to the bridge over the Cam Brook at Carlingcott Mill is getting quite overgrown. · Public Rights of Way · OpenNo sheltered seat at the Red Post in bus stopI have reported this few years back and they told me that there were no funds but now they have all these funds to make improvement in PSJ so they should look… · Bus stop/shelter issue · OpenLarge crack in the pavement between 49 & 51 wellow tyningLarge crack on the pavement. · Damage to pavement · OpenOvergrown and footpath getting narrowWork was carried out to improve the footpath between Rag Hill and Braysdown lane a few years ago, but it is now overgrown and in parts the footpath is narrow… · Public Rights of Way · OpenFootpath overgrownPlease find attached photos of the overgrown footpath/ driveway along Bloomfield way, just off of Braysdown lane. · Public Rights of Way · OpenVegetation overgrowing the pavementVegetation overgrowing the pavement from land owned by nearby properties · Obstructive vegetation · OpenOverhanging thorny branches across the pavement where children walk to get to the schoolThe brambles have grown and are now overhanging the pavement. · Obstructive vegetation · OpenBus shelter night light out next to property 4 Ashgrove Bath rdBus shelter night light out · Bus stop/shelter issue · OpenBus shelter night light out on Bath rd next to Peasedown take wayBus shelter night light out · Bus stop/shelter issue · Open

Peasedown

More in Peasedown

Where this comes from

The source

Reports from fix.bathnes.gov.uk (FixMyStreet). FixMyStreet / B&NES.